23-0043 Swearengin Water System IIJA Energy Upgrades & ARPA Tank Refurbishment (nr)

The works consists of rehabilitation to one elevated steel water storage tank, installation of two variable frequency drives at two booster pump stations, installation of one chlorine analyzer at two booster pump stations, and SCADA integration at all locations.
DIGITAL DOWNLOAD Complete Set (click to expand/collapse)
***** This section is for the purchase of Digital files. Once the order is received and verified a download link will be provided, in a separate email. This project consists of specs only.*****
Order this section for $59.95
Name Date Size
0001-1 5/15/2024 1.0 MB
0002-2 5/15/2024 721.1 KB
0003-3 5/15/2024 435.1 KB
0004-4 5/15/2024 438.1 KB
0005-5 5/15/2024 532.2 KB
0006-6 5/15/2024 1.4 MB
0007-7 5/15/2024 256.0 KB
0008-8 5/15/2024 388.9 KB
0009-9 5/15/2024 555.6 KB
2024-05-14 Project Specifications for Swearengin IIJA Energy Upgrades and ARPA Tank Refurbishment 5/15/2024 9.0 MB
HARD COPY Complete Set (click to expand/collapse)
***** This section is for Complete HARDCOPY Prints ONLY. *****
Order this section for $185.63
Name Date Size
0001-1 5/15/2024 1.0 MB
0002-2 5/15/2024 721.1 KB
0003-3 5/15/2024 435.1 KB
0004-4 5/15/2024 438.1 KB
0005-5 5/15/2024 532.2 KB
0006-6 5/15/2024 1.4 MB
0007-7 5/15/2024 256.0 KB
0008-8 5/15/2024 388.9 KB
0009-9 5/15/2024 555.6 KB
2024-05-14 Project Specifications for Swearengin IIJA Energy Upgrades and ARPA Tank Refurbishment 5/15/2024 9.0 MB