23-0043 Swearengin Water System IIJA Energy Upgrades & ARPA Tank Refurbishment (nr)
The works consists of rehabilitation to one elevated steel water storage tank, installation of two variable frequency drives at two booster pump stations, installation of one chlorine analyzer at two booster pump stations, and SCADA integration at all locations.
Addendum 1
(click to expand/collapse)
Name | Size | ||
Addendum1-Specs | 1.1 MB |
Addendum 2
(click to expand/collapse)
Name | Size | ||
Addendum2-Specs | 711.8 KB |