22-0032 Town of Lexington Sewer System Improvements (CWSRF Project #CS010886-02) (nr)

The project consists of demolition of existing sewer lagoon infrastructure, removal of sediment, liners, and appurtenances from two sewer lagoon cells and disposal of the same. Installation of new lagoon aeration, baffle curtain, effluent pumps, blowers, controls, sludge pump, valves, actuators, and related equipment for a fully functional lagoon treatment system.
DIGITAL DOWNLOAD Complete Set (click to expand/collapse)
***** This section is for the purchase of Digital files. Once the order is received and verified a download link will be provided, in a separate email. This project consists of specs only.*****
Order this section for $99.70
Name Date Size
0001-1 5/3/2024 1.3 MB
0002-2 5/3/2024 2.0 MB
0003-3 5/3/2024 1.9 MB
0004-4 5/3/2024 1.4 MB
0005-5 5/3/2024 1.4 MB
0006-6 5/3/2024 1.6 MB
0007-7 5/3/2024 1.4 MB
0008-8 5/3/2024 1.4 MB
0009-9 5/3/2024 1.7 MB
0010-10 5/3/2024 1.6 MB
0011-11 5/3/2024 1.6 MB
0012-12 5/3/2024 1.4 MB
0013-13 5/3/2024 1.7 MB
22-0032 Specs 5/3/2024 6.7 MB
HARD COPY Complete Set (click to expand/collapse)
***** This section is for Complete HARDCOPY Prints ONLY. *****
Order this section for $283.89
Name Date Size
0001-1 5/3/2024 1.3 MB
0002-2 5/3/2024 2.0 MB
0003-3 5/3/2024 1.9 MB
0004-4 5/3/2024 1.4 MB
0005-5 5/3/2024 1.4 MB
0006-6 5/3/2024 1.6 MB
0007-7 5/3/2024 1.4 MB
0008-8 5/3/2024 1.4 MB
0009-9 5/3/2024 1.7 MB
0010-10 5/3/2024 1.6 MB
0011-11 5/3/2024 1.6 MB
0012-12 5/3/2024 1.4 MB
0013-13 5/3/2024 1.7 MB
22-0032 Specs 5/3/2024 6.7 MB