22-0032 Town of Lexington Sewer System Improvements (CWSRF Project #CS010886-02) (nr)
The project consists of demolition of existing sewer lagoon infrastructure, removal of sediment, liners, and appurtenances from two sewer lagoon cells and disposal of the same. Installation of new lagoon aeration, baffle curtain, effluent pumps, blowers, controls, sludge pump, valves, actuators, and related equipment for a fully functional lagoon treatment system.
Addendum 1
(click to expand/collapse)
Name | Size | ||
Addendum1-Specs | 1.6 MB |
Addendum 2
(click to expand/collapse)
Addendum 3
(click to expand/collapse)
Name | Size | ||
Addendum3-Specs | 540.2 KB |
Addendum 4
(click to expand/collapse)
Name | Size | ||
0006-6 | 372.7 KB | ||
Addendum4-Specs | 719.4 KB |
Addendum 5
(click to expand/collapse)
Name | Size | ||
0006-6 | 477.9 KB | ||
Addendum5-Specs | 545.0 KB |