20-0027 Greenpond Water System Industrial Park Water Line & Railroad Crossing (nr)
The project consists of installing approximately 3,875 linear feet of 12" ductile iron water line and the jack and bore installation method of approximately 210 linear feet of 24" steel casing with 12" ductile iron carrier pipe under the Norfolk Southern Railroad tracks.
Addendum 1
(click to expand/collapse)
Name | Size | ||
Addendum1-Specs | 7.7 MB |
Addendum 2
(click to expand/collapse)
Name | Size | ||
0005-5 | 2.1 MB | ||
0006-6 | 2.2 MB | ||
Addendum2-Specs | 568.3 KB |