22-0068 Moulton Water Treatment Plant Improvements Phase I DWSRF FS010193-02 (nr)

Replacement of the south clearwell roof and refurbishing the small and large pipe galleries at the water treatment plant
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
0001-1 764.9 KB
0002-2 529.0 KB
0003-3 406.6 KB
0004-4 1.6 MB
0005-5 334.5 KB
0006-6 261.3 KB
0007-7 310.5 KB
0008-8 291.1 KB
0009-9 287.4 KB
0010-10 265.3 KB
0011-11 338.1 KB
0012-12 278.7 KB
0013-13 270.3 KB
0014-14 266.4 KB
0015-15 292.6 KB
0016-16 352.6 KB
0017-17 312.9 KB
0018-18 392.6 KB
0019-19 4.5 MB
0020-20 278.0 KB
0021-21 372.2 KB
0022-22 603.5 KB
Addendum1-Specs 1.1 MB
Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum2-Specs 158.5 KB
Addendum 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum3-Specs 166.3 KB
Addendum 4 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum4-Specs 1.4 MB
Addendum 5 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum5-Specs 176.0 KB