22MIS04D Campus Electrical & High Voltage Repair Phase IV (nr)
*****This project REQUIRES A DEPOSIT CHECK made payable to Consulting Construction Engineering *****$150 PER SET up to (2) sets*****
Addendum 1
(click to expand/collapse)
Name | Size | ||
0003-E3 | 1.0 MB | ||
0004-E4 | 395.9 KB | ||
0005-E5 | 279.6 KB | ||
0006-E6 | 268.0 KB | ||
0007-E7 | 635.9 KB | ||
0008-E8 | 434.5 KB | ||
0009-E9 | 417.0 KB | ||
0012-E12 | 314.9 KB | ||
0014-E14 | 315.1 KB | ||
0015-E15 | 332.1 KB | ||
0016-E16 | 328.2 KB | ||
0017-E17 | 413.3 KB | ||
0018-E18 | 326.1 KB | ||
0019-E19 | 320.2 KB | ||
0022-E22 | 414.6 KB | ||
0023-E23 | 308.2 KB | ||
0024-E24 | 303.6 KB | ||
Addendum1-Specs | 199.3 KB |
Addendum 2
(click to expand/collapse)