24-0033 Ashland Water Works and Sewer Board SR-9 Water Main Relocation FS010556-01 (nr)
The project consists of installing approximately 1,000 linear feet of 12” PVC water main along State Route 9 just east of downtown Ashland, AL. Following installation and connection of the proposed water main, approximately 950 linear feet of existing 12” asbestos concrete water main will be grout filled and abandoned.
Addendum 1
(click to expand/collapse)
Name | Size | ||
0004-4 | 1.1 MB | ||
0005-5 | 539.1 KB | ||
Addendum1-Specs | 11.0 MB |