22MIS04E Campus Electrical & High Voltage Repair Phase V (nr)

Installation of electrical equipment to complete Loop #3 of electrical primary 15KV system.
DIGITAL DOWNLOAD Complete Set (click to expand/collapse)
***** This section is for the purchase of Digital files. Once the order is received and verified a download link will be provided, in a separate email. *****
Order this section for $54.80
Name Date Size
0001-E1 7/31/2024 636.2 KB
0002-E2 7/31/2024 816.5 KB
0003-E3 7/31/2024 670.6 KB
0004-E4 7/31/2024 438.4 KB
0005-E5 7/31/2024 689.4 KB
22MIS04E Specs 7/31/2024 11.9 MB
HARD COPY Complete Set (click to expand/collapse)
***** This section is for Complete HARDCOPY Prints ONLY. *****
Order this section for $89.68
Name Size
0001-E1 636.2 KB
0002-E2 816.5 KB
0003-E3 670.6 KB
0004-E4 438.4 KB
0005-E5 689.4 KB
22MIS04E Specs 11.9 MB