22MIS04E Campus Electrical & High Voltage Repair Phase V (nr)
Installation of electrical equipment to complete Loop #3 of electrical primary 15KV system.
DIGITAL DOWNLOAD Complete Set
(click to expand/collapse)
***** This section is for the purchase of Digital files. Once the order is received and verified a download link will be provided, in a separate email. *****
Name | Date | Size | ||
0001-E1 | 7/31/2024 | 636.2 KB | ||
0002-E2 | 7/31/2024 | 816.5 KB | ||
0003-E3 | 7/31/2024 | 670.6 KB | ||
0004-E4 | 7/31/2024 | 438.4 KB | ||
0005-E5 | 7/31/2024 | 689.4 KB | ||
22MIS04E Specs | 7/31/2024 | 11.9 MB |
HARD COPY Complete Set
(click to expand/collapse)