18530.000 Gordo Water Gas and Sewer Board Utility Relocation (nr)

Relocation of potable water and natural gas mains associated with the U.S. Highway 82 Bypass Project, 100 LF of 6” PVC, Class 200 water main, 500 LF of 4” welded steel gas main, 2-4” gas main hot taps, 2-4” gas main stoppels and other ancillary items.
DIGITAL DOWNLOAD Complete Set (click to expand/collapse)
***** This section is for the purchase of Digital files. Once the order is received and verified a download link will be provided, in a separate email. *****
Order this section for $50.00
Name Date Size
0001-TS 7/15/2024 380.6 KB
0002-GN1 7/15/2024 95.2 KB
0003-C1 7/15/2024 401.2 KB
0004-C2 7/15/2024 169.8 KB
0005-SD1 7/15/2024 191.4 KB
0006-SD2 7/15/2024 66.8 KB
0007-D1 7/15/2024 158.9 KB
18530.000 Specs 7/15/2024 1.1 MB
HARD COPY Complete Set (click to expand/collapse)
***** This section is for Complete HARDCOPY Prints ONLY. *****
Order this section for $50.72
Name Date Size
0001-TS 7/15/2024 380.6 KB
0002-GN1 7/15/2024 95.2 KB
0003-C1 7/15/2024 401.2 KB
0004-C2 7/15/2024 169.8 KB
0005-SD1 7/15/2024 191.4 KB
0006-SD2 7/15/2024 66.8 KB
0007-D1 7/15/2024 158.9 KB
18530.000 Specs 7/15/2024 1.1 MB