23-0035 State Energy Program IIJA Energy Efficient Retrofits for Hawk Pride Mountain Water System
The project consists of installing new variable frequency drives at the Water Treatment Plant and Booster Pump Station; installing SCADA hardware at the Water Treatment Plant and distribution system facilities; as well as integration of those facilities into the existing SCADA network.
Addendum 1
(click to expand/collapse)
Name | Size | ||
Addendum1-Specs | 661.9 KB |