17174.001 Gordo Sullivan Well Rehab Phase 2 Equipment Building and Clearwell Rehab REBID
Status
Bidding Closed
Prebid Date | 10/17/24 9:00am |
Bid Date | 10/24/24 10:00am |
Location
Gordo, AL
See Documents section above for additional bid requirements/info
Sealed bids will be received by the Gordo Water, Gas and Sewer Board 10:00 A.M. Local Time, October 24, 2024, at THE GORDO WATER, GAS AND SEWER BOARD, 313 Main Street, Gordo, AL 35466 for supplying all labor and materials (as specified) necessary for SULLIVAN WATER TREATMENT PLANT REHABILITATION PROJECT, PHASE 2 – EQUIPMENT BUILDING & CLEARWELL REHAB DWSRF #FS010412-01.
A mandatory Pre-Bid Conference will be held at 9:00 A.M., Local Time October 17, 2024, at the Gordo Water, Gas and Sewer Board offices, 313 Main Street, Gordo, AL 35466. Prospective Contractors must have a representative in attendance at this meeting for their bid to be considered.
This project consists of:
Removal and replacement of existing vertical turbine high service pumps
Removal and replacement of existing valves
Removal and replacement of existing aerator tower assembly
Refurbishment of existing equipment building and replacement of existing chemical and chlorination equipment
Installation of diesel engine driven emergency power generator
Rehabilitation of existing clear well
You may use your ESTABLISHED Net 30 Alabama Graphics Account, cash/check, or credit card to purchase this project.
Please note that some orders may be adjusted at time of delivery and/or shipping. Your invoice total may be adjusted +/- according to the destination or size of order.
For assistance with this website, please contact customer service at 205-252-8505